Step 1: Backup Scope Definition

Identify all critical data and systems requiring backup.

Critical systems:

Backup requirements per system:

Owner: Infrastructure Team, Engineering Team Duration: Initial setup, reviewed annually

Step 2: Automated Backup Configuration

Configure automated backups for all critical systems.

Database backups (RDS):

Object storage (S3):

Infrastructure as Code:

Secrets and keys:

Owner: Infrastructure Team Duration: Initial configuration, ongoing monitoring

Step 3: Backup Monitoring

Monitor backup jobs for success and alert on failures.

Monitoring:

Alert response:

Owner: Infrastructure Team Duration: Ongoing, daily monitoring

Step 4: Backup Security

Ensure backups are encrypted and access-controlled.

Security requirements:

Owner: Infrastructure Team, Security Team Duration: Initial configuration, quarterly audits

Step 5: Recovery Testing

Test backup restoration regularly to verify recovery capabilities.

Testing frequency:

Test process:

  1. Select recent backup snapshot
  2. Restore to isolated test environment (not production)
  3. Verify data integrity (checksums, row counts, sample queries)
  4. Test application functionality against restored data
  5. Measure time to restore (validate RTO)
  6. Document results and any issues

Success criteria:

Owner: Infrastructure Team Duration: Quarterly tests (2-3 hours per test)

Step 6: Disaster Recovery Drill

Conduct annual full disaster recovery drill simulating complete production failure.

Scenario: Primary AWS region is unavailable, must restore from backups in secondary region.

Drill steps:

  1. Declare disaster recovery scenario
  2. Restore latest backups to DR region
  3. Reconfigure DNS/load balancers to point to DR environment
  4. Verify application availability and data integrity
  5. Measure time to full recovery
  6. Document lessons learned

Owner: Infrastructure Team, Engineering Team Duration: 4-8 hours (annual drill)

Step 7: Backup Documentation

Maintain up-to-date recovery runbooks.

Documentation includes:

Owner: Infrastructure Team Duration: Updated quarterly or after any infrastructure changes

Backup Retention

Production data:

Infrastructure snapshots:

Restore Request Process

Non-emergency restore (e.g., accidental deletion):

  1. Engineer submits restore request ticket
  2. Infrastructure team reviews request and approves
  3. Restore performed to isolated environment or specific timeframe
  4. Data verified and handed off to requester
  5. Restore documented in ticket

Emergency restore (production incident):

  1. Incident commander authorizes restore
  2. Infrastructure team restores immediately
  3. Document restore in incident ticket

Validation and Evidence

References

Control Mapping


Referenced By

This section is automatically generated by make generate-backlinks. Do not edit manually.